2020

FB 2020-04

Feasibility study and limnological evaluation of the new body of water at Tiefes Feld

  • Funded by: City Planning Agency of Nuremberg
  • Feasibility study, hydrology, limnology
  • Project duration: September 2019 to June 2020
  • Researcher(s): Carstensen, D.; Rostan, F.; Vollweiler, T.; Kögel, M.

FB 2020-03

White Elster, Hartmannsdorf, damage repair, 2013 flooding – Hartmannsdorf gradient level – Modelling of hydraulic conditions

  • Funded by: Dam authority of the Free State of Saxony, Elbaue / Mulde / Lower White Elster operation
  • 3D HN modelling, velocity analyses, turbulence
  • Project duration: August 2019 to August 2020
  • Researcher(s): Carstensen, D.; Kögel, M.; Heß, M.;

FB 2020-02

Sennfelder Seenkranz, Sennfeld – Bathymetry autumn 2019

  • Funded by: OCHS Bohrgesellschaft mbH
  • Bathymetry, photogrammetry, echo sounding, water drone, autonomous measuring vehicle, surveying
  • Project duration: October 2019 to March 2020
  • Researcher(s): Kögel, M.; Vollweiler, T.

2019

FB 2019-04

Großer Dutzendteich Nuremberg – Bathymetry Spring 2019

  • Funded by: Nuremberg Servicebetrieb Öffentlicher Raum [Public Space Services]
  • Bathymetry, echo sounding, water drone, autonomous measuring vehicle, surveying
  • Project duration: April 2019 to December 2019
  • Researcher(s): Carstensen, D.; Kögel, M.; Vollweiler, T.

FB 2019-03

LIFE LOCAL ADAPT: Lockwitzbach Coswig opening

  • Funded by: Saxony State Office for the Environment, Agriculture and Geology
  • Surveying, GIS project, model development, 2D HN modelling
  • Project duration: March 2019 to June 2019
  • Researcher(s): Carstensen, D.; Rostan, F.

FB 2019-02

Recording the hydraulic conditions in the Steffstep system 

  • Funded by: WALTER REIST HOLDING AG
  • Laboratory investigations, 3D HN modelling
  • Project end: May 2019
  • Researcher(s): Carstensen, D.; Heß, M.; Kögel, M.; Vollweiler, T.

FB 2019-01

Freeboard check for the Sylvenstein reservoir

  • Funded by: Weilheim Office for Water Resources Management
  • Wind-wave-ice calculation, data correlation, 2D HN modelling, 3D HN modelling
  • Project duration: February 2019 to January 2020
  • Researcher(s): Heß, M.; Kögel, M.; Windolf, F.

2018

FB 2018-14

Bathymetry of the Zeltnerweiher pond - in the area of the outlet and overall intake

  • Funded by: Nuremberg Servicebetrieb Öffentlicher Raum [Public Space Services]
  • Bathymetry, photogrammetry, echo sounding, water drone, autonomous measuring vehicle, surveying
  • Project duration: October 2018 to December 2018
  • Researcher(s): Kögel, M.; Vollweiler, T.

FB 2018-13

Flood water basin Friedrichswalde/Ottendorf - Reconstructing flood security by adapting the spillway - model experiments

  • Funded by: Research commissioned by the Dam authority of the Free State of Saxony, Elbtal operation
  • 3-dimensional hydrodynamic-numerical (3d-HN) simulation, physical model experiment
  • Project duration: October 2017 to August 2018
  • Researcher(s): Carstensen, D.; Heß, M.; Vollweiler, T.; Martin, K.; Eggstein, C.

FB 2018-08

Replacement railway bridge construction over the White Elster, Nahle and Neue Luppe

  • Client: Dam authority of the Free State of Saxony Elbaue/Mulde/Lower White Elster operation
  • 2D HN modelling, GIS, research
  • Project duration: December 2017 to June 2018
  • Researcher(s): Carstensen, D.; Wilhelm, J.; Ahlers, C., Bellmann, C.

FB 2018-06

Two-dimensional hydrodynamic numerical simulation of the Elbe taking into consideration the different plans to extend the B169 highway east of Riesa

  • Client: State Office for Road Construction and Traffic, Meissen branch, Department 21 | Planning
  • 2D HN modelling, GIS, research
  • Project duration: March 2018 to July 2018
  • Researcher(s): Carstensen, D.; Wilhelm, J.; Ahlers, C.

FB 2018-04

Two-dimensional hydrodynamic simulation of the Elbe at Dresden (State capital), Blockhaus flood protection measure, Neustädter Markt 19, Dresden

  • Client: GIP Grundwasser-Ingenieurbau-Planung GmbH, Dresden
  • 2D HN modelling, GIS, research
  • Project duration: January 2018 to March 2018
  • Researcher(s): Carstensen, D.; Wilhelm, J.; Ahlers, C.

FB 2018-03

Flood water basin Friedrichswalde/Ottendorf - Reconstructing flood security by adapting the spillway

  • Funded by: Research commissioned by the Dam authority of the Free State of Saxony, Elbtal operation
  • 3-dimensional hydrodynamic-numerical (3d-HN) simulation, physical model experiment
  • Project duration: October 2017 to August 2018
  • Researcher(s): Carstensen, D.; Heß, M.; Vollweiler, T.; Falkner, J.

FB 2018-02

Wind and wave reports Scheibe-See Expert opinion on wave and ice load as well as on the transport of solid matter

  • Funded by: Lausitzer und Mitteldeutsche Bergbau-Verwaltungsgesellschaft mbH – LMBV
  • three-dimensional surveying (photogrammetry, laser scanning), bathymetry, analysis of long-term climate data, wave forecasts, sediment transport
  • Project duration: April 2017 to February 2018
  • Researcher(s): Carstensen, D.; Bellmann, C.; Dürr, S.; Heß, M.; Killing,T.; Kögel, M.; Martin, K.;      Vollweiler, T.

2017

FB 2017-06

New construction of a combined transport terminal in the port of Riesa – investigation into the impact of the project on the fixed Elbe floodplain and the influence on flood runoff occurrences

  • Client: Sächsische Binnenhäfen Oberelbe GmbH
  • 2D HN modelling, GIS, research
  • Project duration: March 2017 to June 2017
  • Researcher(s): Carstensen, D.; Wilhelm, J.; Ahlers, C.

FB 2017-03

2D hydrodynamic numerical modelling of the Rednitz at the former Förstermühle, upstream of the infra fürth GmbH hydroelectric power station

  • Client: sje - Ecohydraulic Engineering GmbH
  • 2D HN modelling, GIS, data analysis
  • Project duration: March 2017 to July 2017
  • Researcher(s): Bellmann, C.; Carstensen, D.; Ahlers, C.; Heß, M.; Vollweiler, T.

FB 2017-02

Determining the impact of the Bundesstrasse 2 highway on the White Elster flood runoff at Pegau-Audigast

  • Client: Dam authority of Saxony
  • 2D HN modelling, GIS, data analysis
  • Project duration: July 2016 to January 2017
  • Researcher(s): Carstensen, D.; Wilhelm, J

FB 2017-01

Implementation of intervention planning on the test stretch of the White Elster, south of Leipzig at Pegau – as part of a Water Framework Directive intervention plan (LfULG [State Office for the Environment, Agriculture and Geology] project) – 2D HN modelling

  • Client: Dam authority of Saxony
  • 2D HN modelling, GIS, data analysis
  • Project duration: January 2017 to December 2017
  • Researcher(s): Carstensen, D.; Wilhelm, J.

2016

FB 2016-07

Söse Dam forebay 3D CFD simulations and physical model experiment for a combined-use structure

  • Client: Harzwasserwerke GmbH
  • 3D CFD modelling, physical model experiment, measurements
  • Project duration: February 2016 to July 2016
  • Researcher(s): Carstensen, D.; Heß, M.; Ahlers, C.; Vollweiler, T.

FB 2016-06

Two-dimensional hydrodynamic numerical simulation of the Elbe at Dresden (State capital) – change in water level due to construction project in accordance with building permit AZ: 63/1/BV/05326/15

  • Client: USD Immobilien GmbH
  • 2D HN modelling, GIS, data analysis
  • Project duration: November 2015 to May 2016
  • Researcher(s): Carstensen, D.; Wilhelm, J.

FB 2016-05

2D HN modelling for the Pegau area – flood event analysis June 2013

  • Client: Dam authority of Saxony
  • 2D HN modelling, GIS, data analysis
  • Project duration: June 2016 to December 2016
  • Researcher(s): Carstensen, D.; Wilhelm, J.

FB 2016-04

2D HN modelling of the White Elster at Lake Zwenkau

  • Client: Dam authority of Saxony
  • 2D HN modelling, GIS, flood protection
  • Project duration: December 2015 to June 2016
  • Researcher(s): Carstensen, D.; Wilhelm, J.

FB 2016-03

Modelling of the stilling basin of the Spremberg Dam

  • Client: Brandenburg State Office for the Environment, Health and Consumer Protection
  • 3D and 2D HN modelling, physical model experiment, GIS, data analysis
  • Project duration: August 2015 to November 2016
  • Researcher(s): Heß, M.; Carstensen, D.; Ahlers, C.; Vollweiler, T.

FB 2016-02

Two-dimensional hydrodynamic numerical simulation of the Elbe between Diesbar and Strehla (Elbe Km 93.800 to 115.000)

  • Client: Dam authority of Saxony
  • 2D HN modelling, GIS, data analysis
  • Project duration: June 2016 to December 2016
  • Researcher(s): Carstensen, D.; Wilhelm, J.; Ahlers, C.

2015

FB 2015-06

Einschränkung von Gefahren bei Winterhochwassern (Hazard Limitation in the event of Winter Flooding, EGWin) - funded by the STAEDTLER Foundation

  • Funder: STAEDTLER Foundation
  • Ice flooding, ice stress, research, measurements, model experiment
  • Project duration: November 2013 to September 2015
  • Researcher(s): Carstensen, D.; Heß, M.; Ahlers, C.; Brünkmann, R.; Vollweiler, T.; Johnscher, L.

FB 2015-05

Two-dimensional hydrodynamic numerical simulation of the Elbe at Dresden (State capital) – Sensitivity investigation to assess discharge curve at the Dresden water gauge 

  • Client: Federal Institute for Hydrology Koblenz
  • 2D HN modelling, analytics, research, GIS
  • Project duration: October 2014 to December 2015
  • Researcher(s): Wilhelm, J.; Ahlers, C.; Carstensen, D.

FB 2015-04

Expert report on ice and wave stress on the Großer Brombachsee reservoir

  • Client: Ansbach Office for Water Resources Management
  • Climate data analysis, ice and wave forecasting, wave runup, ice stresses
  • Project duration: January 2015 to July 2015
  • Researcher(s): Carstensen, D.; Heß, M.; Färber, M.

FB 2015-03

Two-dimensional hydrodynamic numerical simulation of the Elbe at Dresden (State capital) – Update to existing Dresden city model and event analysis of 2013 flooding

  • Client: Saxony State Office for the Environment, Agriculture and Geology
  • 2D HN modelling, data analysis, GIS
  • Project duration: June 2014 to July 2015
  • Researcher(s): Wilhelm, J.; Carstensen, D.

FB 2015-02

TERRABENT – Review of functionality and water permeability – physical model experiment

  • Client: BECO Bermüller & Co. GmbH
  • Material testing, review of construction details, physical model experiments in the lab for hydraulic engineering
  • Project duration: February 2015 to October 2015
  • Researcher(s): Vollweiler, T.; Dürr, S.; Heß, M.; Carstensen, D.; Kahr, M.

FB 2015-01

Lausitzer Neiße - Hagenwerder pool, Hagenwerder treatment plant - feasibility study - 2D HN modelling

  • Client: iKD Ingenieur-Consult GmbH Saxony
  • GIS, feasibility study, 2D HN modelling
  • Project duration: September 2014 to April 2015
  • Researcher(s): Wilhelm, J.; Carstensen, D.

2014

FB 2014-06

Determination of hydraulic conditions in the spillway at the Pirk dam

  • Dam authority of Saxony
  • 3D HN modelling, research, data analysis
  • Project duration: September 2014 to May 2015
  • Researcher(s): Heß, M.; Carstensen, D.; Ahlers, C.; Färber, M.

FB 2014-05

Bathymetry of the Grosser Dutzendteich lake in Nuremberg – Visualization, feasibility study – Conducted using the “hydroOHM” survey boat

  • Client: City of Nuremberg – Nuremberg Public Space Services (SÖR) – Civil Engineering department
  • Bathymetry, measurements
  • Project duration: June 2014 to December 2014
  • Researcher(s): Vollweiler, T.; Carstensen, D.

FB 2014-03

Determination of the hydraulic parameters of spillways - spillway chute, scour, and stilling basin - for the Reinhardtsgrimma retention basin using physical modelling

  • Client: Dam authority of the Free State of Saxony
  • Physical model experiment, data analysis, measurements
  • Project duration: January 2014 to February 2015
  • Researcher(s): Heß, M.; Carstensen, D.; Vollweiler, T.; Brünkmann, R.

FB 2014-02

Proof of the impacts of a planned flood protection system for the Hosterwitz water works

  • Client: DREWAG Netz GmbH
  • 2D HN modelling, GIS, flood protection
  • Project duration: June 2014 to December 2014
  • Researcher(s): Wilhelm, J.; Carstensen, D.; Heß, M.

FB 2014-01

Expert report on ice and wave stress on the Lake Berzdorf at Deutsch Ossig

  • Client: CDM Smith Consult GmbH
  • Climate data analysis, ice and wave forecasting, wave runup, ice stresses
  • Project duration: October 2013 to April 2014
  • Researcher(s): Carstensen, D.; Heß, M.; Brünkmann, R.

2013

FB 2013-03

Determination of the hydraulic parameters of spillways – chutes and stilling basins – for the Wippra retention basin using physical modelling

  • Client: Saxony-Anhalt Dam Operator
  • Physical model experiment, measurements
  • Project duration: July 2013 to December 2013
  • Researcher(s): Carstensen, D.; Vollweiler, T.; Heß, M.; Brünkmann, R.; Bechstein, J.

FB 2013-02

Hydraulic dimensioning of the spillway for the Reinhardsgrimma retention basin

  • Client: Dam authority of the Free State of Saxony
  • Physical model experiment, measurements, review of construction details
  • Project duration: March 2013 to September 2013
  • Researcher(s): Carstensen, D.; Vollweiler, T; Heß, M.; Brünkmann, R.; Bechstein, J.; Rohra, R.